Description
<p>Newly reformed logistics center in Coslada.</p> <p>Coslada Mirastar is a newly renovated logistics center whose objective is to meet the growing demand for logistics services in the town of Coslada, offers a flexible infrastructure to adapt to the maximum to the needs of users.</p> <p>The center is located in the northeast area of the city of Madrid, in the second largest city in Spain, which allows a strategic positioning for the transport and distribution of parcels within Madrid and the axis of the Corredor de Henares. </p> <p>Located practically opposite the Adolfo Suarez Madrid Barajas Airport, it offers a unique location for international air freight transport.</p> <p>The Coslada CTC has a consolidated presence of companies in the sector.</p> <p><strong>CHARACTERISTICS</strong>:<br /> - Building "Type C".<br /> - Medium Risk Level 5, new fire protection installation: detection, BIES and sectorizations.<br /> - Prefabricated concrete structure<br /> - Docks: 16 loading and unloading (1 dock/ 480 m²)<br /> - Maneuvering beach: 28 meters<br /> - 1 inside ramp, 1 outside ramp and 1 gate<br /> - Clear height under beam: 8 m in the transit area and 12.95 m in the storage area<br /> - Parking spaces on plot: 95<br /> - Energy certificate A: Installation of photovoltaic solar panels for self-consumption (50 kW),<br /> - LED lighting, about 8% of natural lighting in the warehouse through skylights and skylights.<br /> - New exterior carpentry with high thermal-acoustic performance.<br /> - Anti-intrusion security (volumetric detectors, physical barriers, etc.)<br /> - Access control sentry box<br /> - Fitted out offices on three floors (glass partitions, air conditioning, furniture, air-conditioned data processing room, voice and data installed).<br /> - Generator set<br /> - Highly representative and corporate image<br /> - Racks installed in the central body of the building.</p> <p><br /> <strong>SUSTAINABILITY:</strong></p> <p><br /> Coslada Mirastar reinforces its sustainability and meets the objective of moving towards environmental, social and economic efficiency of the so-called green logistics.</p> <p><br /> - EPC A CO2 emissions 6.21 kg CO2/m² year.<br /> - 50kWp photovoltaic plant for self-consumption.<br /> - New exterior carpentry with thermal bridge break, triple low emissive glass and argon chamber.</p> <p><br /> <strong>CONNECTIONS</strong>: <br /> - M-21 to 3 min<br /> - Madrid center at 17 mins <br /> - Airport at 7 mins<br /> - Cercanías stations (Coslada central or San Fernando) 10 mins away. <br /> - Very close to the A-2 freeway connecting Madrid with Barcelona.<br /> - Access to M-21, M-50 and M-45</p> <p><strong>AVAILABLE SPACES: </strong><br /> TOTAL GLA: 7,668 m²<br /> - Warehouse: 5,760 m²<br /> - Offices: 1,833 m² </p> <p> </p> <p><strong>IMMEDIATE</strong> availability</p> <p><br /> <em>Common expenses <strong>NOT </strong>included in the rent</em></p>
Read more
Features
- Docks
- Air conditioning
- Lighting
- Area A-2
- Toilets